REFCO 3004145

GOBI II Universal Condensate Pump

ماڊل: 3004145

ھدايت وارو دستور

1. تعارف

The REFCO GOBI II Universal Condensate Pump is designed for efficient and quiet removal of condensate from air conditioning, HVAC, and dehumidifier systems. Suitable for systems ranging from 6,000 BTU/h to 120,000 BTU/h, this pump features a digital water sensor, universal voltage compatibility, and individually configurable flow rates, making it a versatile solution for various applications. This manual provides essential information for safe installation, operation, maintenance, and troubleshooting of your GOBI II pump.

REFCO GOBI II Universal Condensate Pump, assembled view

شڪل 1.1: گڏ ٿيل view of the GOBI II Universal Condensate Pump.

2. حفاظت جي ڄاڻ

مھرباني ڪري انسٽاليشن ۽ آپريشن کان اڳ سڀ حفاظتي هدايتون احتياط سان پڙھو. انھن هدايتن تي عمل ڪرڻ ۾ ناڪامي بجليءَ جو جھٽڪو، باهه، يا سنگين زخمي ٿي سگھي ٿي.

  • Always disconnect power to the air conditioning unit and the pump before performing any installation, maintenance, or troubleshooting.
  • Installation must be performed by a qualified technician in accordance with all local and national electrical and plumbing codes.
  • Ensure the pump is installed in a location where it is protected from direct water spray and extreme temperatures.
  • Do not operate the pump with damaged cables or if it has been dropped or damaged.
  • This pump is designed for condensate water only. Do not use it for other liquids.
  • Keep children and unauthorized persons away from the installation area.

3. پراڊڪٽ ختمview

The GOBI II pump system consists of several key components designed for reliable condensate removal.

Diagram showing GOBI II pump components and included accessories

Figure 3.1: GOBI II kit components and labeled diagram.

3.1. شامل جزا:

  • پاور ڪيبل
  • الارم ڪيبل
  • Star tube and anti-siphon device
  • Screws (for mounting)
  • اسڪرو لنگر
  • Factory-installed alarm fuse
  • ڪيبل لاڳاپا

3.2. اهم خاصيتون:

  • Universal application for various AC systems.
  • High pumping capacity: 11 GPH (gallons per hour).
  • High discharge head: up to 65.6 ft.
  • Extremely quiet operation: less than 19 dB noise level.
  • Reliable digital water sensor, eliminating traditional float problems.
  • Demand-oriented control for optimized pumping capacity.

4. سيٽ اپ ۽ تنصيب

The GOBI II pump is designed for direct mounting under the air conditioner unit. Follow these steps for proper installation:

  1. چڙهڻ: Secure the pump's wall back plate (component 9 in Figure 3.1) to a stable surface directly beneath the air conditioning unit using the provided screws and screw anchors. Ensure it is level.
  2. Pump Body Installation: Slide the pump body (component 1 in Figure 3.1) onto the mounted back plate until it clicks securely into place.
  3. Condensate Inlet Connection: Connect the condensate drain line from the air conditioning unit to the pump's inlet. Ensure a tight, leak-free connection.
  4. ڊسچارج لائين ڪنيڪشن: Connect the 1/4" discharge tube from the pump's outlet to your desired drain point. Install the provided anti-siphon device in the discharge line to prevent backflow and ensure proper pump operation. Ensure the discharge line rises vertically for at least 6 inches before running horizontally or downwards.
  5. برقي ڪنيڪشن: Connect the power cable to the pump and then to a suitable power supply (100-240 VAC, 50/60 Hz). Ensure all electrical connections are secure and comply with local electrical codes.
  6. Alarm Cable Connection (Optional but Recommended): Connect the alarm cable to the pump's alarm relay terminals and integrate it with your HVAC system's alarm circuit if desired. The alarm relay is interchangeable (NO or NC) and rated for 250VAC, 6.3A or 28VDC, 6.3A.
  7. جاچ: Once all connections are made, restore power to the system. Pour a small amount of water into the air conditioner's drain pan to verify the pump activates and discharges water correctly. Check for any leaks.

5. آپريٽنگ هدايتون

The GOBI II condensate pump operates automatically based on the water level detected by its digital sensor. It will activate when condensate accumulates and shut off once the water is cleared.

5.1. Digital Sensor and Flow Control:

The integrated digital sensor (component 4 in Figure 3.1) precisely monitors the water level, ensuring the pump activates only when necessary. The pump's demand-oriented control adjusts the pumping capacity as needed, optimizing efficiency and minimizing noise.

5.2. Diagnostic LEDs:

The pump features a diagnostic LED (component 8 in Figure 3.1) to indicate its operational status.

Diagram showing diagnostic LEDs: green for normal operation, red for error

Figure 5.1: Diagnostic LED indicators.

  • گرين لائيٽ: Indicates normal operation. The pump is powered and functioning correctly.
  • ڳاڙهو لال Indicates an error or alarm condition. Refer to the Troubleshooting section for possible causes.

6. سار سنڀال

Regular maintenance ensures the longevity and optimal performance of your GOBI II pump.

  • Monthly Check: Visually inspect the pump, inlet, and discharge lines for any blockages, kinks, or leaks. Ensure the pump housing is clean.
  • سالياني صفائي: Disconnect power to the pump and the AC unit. Carefully remove the pump body from the wall back plate. Clean the water tray (component 5 in Figure 3.1) and the digital sensor (component 4) to remove any sludge, mold, or debris. A soft brush and mild detergent can be used. Rinse thoroughly with clean water.
  • فلٽر متبادل: The pump includes a replaceable filter (component 3 in Figure 3.1). Check its condition during annual cleaning and replace if it appears clogged or damaged.
  • ٻيهر گڏ ڪرڻ: After cleaning, reassemble all components, ensuring they are securely in place. Restore power and test the pump's operation.

7. مسئلا حل ڪرڻ

If you encounter issues with your GOBI II pump, refer to the following table for common problems and solutions. Always disconnect power before attempting any inspection or repair.

مسئلوممڪن سببحل
پمپ نه هلندوNo power; Clogged inlet/outlet; Faulty sensor; Motor issueCheck power supply; Clear blockages; Clean digital sensor; Contact support if issue persists.
پمپ مسلسل هلندو آهيAnti-siphon device missing/incorrectly installed; Leak in discharge line; Sensor issueInstall/check anti-siphon device; Inspect discharge line for leaks; Clean sensor.
پاڻيءَ جي اوسرPump not running; Clogged lines; Pump capacity exceeded; Alarm not connectedSee "Pump does not run"; Clear blockages; Ensure system BTU/h is within pump's range; Connect alarm.
Red diagnostic LED is onError condition (e.g., high water alarm, pump fault)Check for blockages, ensure proper installation, and verify power. If the issue persists after checking, contact technical support.

8. وضاحتون

Detailed technical specifications for the GOBI II Universal Condensate Pump.

پيرا ميٽرقدر
وڌ. وهندڙ اگھ11 جي پي ايڇ (0.18 گيلن في منٽ)
وڌ. ڊسچارج سر65.6 فوٽ
وڌ. سکشن لفٽ10 فوٽ
شور جي سطح<19 ڊي بي (ا)
پمپ جو قسمDiaphragm جو قسم
ٽيوب قطر1/4 ″
جلدtage100 - 240 وي اي سي
تعدد50/60 Hz
توانائي جو واھپو8 ڊبليو
تحفظ ڪلاسI
الارم رليمٽائڻ وارو NO يا NC، درجه بندي 250VAC، 6.3A يا 28VDC، 6.3A
داخل ٿيڻ جي حفاظتIP44
ڪيبل ڊگھائي5 فوٽ
آپريٽنگ جي درجه حرارت جي حد41 - 104 °F (5 - 40 °C)
پاڻي جي گرمي جي حد41 - 104 °F (5 - 40 °C)
اسٽوريج جي درجه حرارت جي حد-4 - 122 °F (-20 - 50 °C)
شيءِ جو وزن2.59 پائونڊ
پيڪيج جي ماپ13.66 x 12.8 x 2.6 انچ

8.1. Capacity Curve:

The following graph illustrates the pump's capacity (flow rate) versus vertical lift/head pressure.

Graph showing GOBI II pump capacity in GPH and l/hr versus vertical lift/head pressure in feet and meters

Figure 8.1: GOBI II Capacity Curve.

9. وارنٽي

The manufacturer warranty for the GOBI II Universal Condensate Pump begins with the commissioning of the unit. Please refer to the warranty documentation included with your purchase for specific terms and conditions.

10. سپورٽ

For technical assistance, spare parts, or further inquiries, please contact your REFCO product supplier or visit the official REFCO webسپورٽ رابطي جي معلومات لاء سائيٽ.

لاڳاپيل دستاويز - 3004145

اڳيview گوبي II ڪنڊينسيٽ پمپ جي انسٽاليشن ۽ آپريشن جو دستور
REFCO Gobi II ڪنڊينسيٽ پمپ لاءِ جامع گائيڊ، HVAC/R سسٽم جي انسٽاليشن، آپريشن، سار سنڀال، ۽ خرابي جي حل کي ڍڪيندي.
اڳيview ريفڪو گوبي II ڪنڊينسيٽ پمپ: تڪڙي انسٽاليشن گائيڊ
REFCO GOBI II ڪنڊينسيٽ پمپ (ماڊل 3004145) لاءِ سرڪاري تڪڙي گائيڊ. HVAC سسٽم ۾ موثر ڪنڊينسيٽ هٽائڻ لاءِ انسٽاليشن، آپريشن، حفاظت ۽ سار سنڀال بابت ضروري معلومات فراهم ڪري ٿي.
اڳيview ريفڪو گوبي II ڪنڊينسيٽ پمپ جي انسٽاليشن ۽ آپريشن مينوئل
A comprehensive guide to the REFCO Gobi II condensate pump, detailing installation, operation, safety precautions, technical specifications, and troubleshooting. Features include configurable quiet mode, diagnostic LED, USB connectivity, and broad application range.
اڳيview ريفڪو ڪمبي يونيورسل ڪنڊينسيٽ پمپ 3004146 انسٽاليشن ۽ ٽيڪنيڪل مينوئل
هي دستاويز REFCO Combi Universal Condensate Pump (ماڊل 3004146) لاءِ جامع تنصيب، ٽيڪنيڪل وضاحتون، حفاظتي هدايتون، ۽ مسئلا حل ڪرڻ جي معلومات فراهم ڪري ٿو.
اڳيview ريفڪو ويAMP-ايف ڪنڊينسيٽ پمپ تڪڙو گائيڊ
REFCO V جي انسٽاليشن، آپريشن ۽ سار سنڀال لاءِ هڪ مختصر گائيڊAMP-ايف ڪنڊينسيٽ پمپ، جيڪو HVAC سسٽم مان ڪنڊينسيٽ کي موثر طريقي سان ختم ڪرڻ لاءِ ٺهيل آهي. ان ۾ ٽيڪنيڪل وضاحتون ۽ حفاظتي هدايتون شامل آهن.
اڳيview ريفڪو ويAMP-X ڪنڊينسيٽ پمپ هدايت نامو
هي هدايت نامو REFCO V تي تفصيلي معلومات فراهم ڪري ٿو.AMP-X ڪنڊينسيٽ پمپ، ان جي وضاحتن، تنصيب، آپريشن، سار سنڀال، حفاظتي هدايتون، ۽ مسئلا حل ڪرڻ کي ڍڪيندو آهي. انگريزي، جرمن، فرينچ، اطالوي، ۽ اسپيني ۾ موجود آهي.