1. تعارف
Thank you for choosing the KATOOL 9500lbs 4 Post Lift, Model 4H950. This manual provides essential information for the safe installation, operation, and maintenance of your new vehicle lift. Please read this manual thoroughly before attempting to assemble or operate the lift. Proper understanding and adherence to these instructions will ensure safe and efficient use, extending the lifespan of your equipment.

Figure 1.1: KATOOL 9500lbs 4 Post Lift, Model 4H950.
2. حفاظت جي ڄاڻ
Your safety and the safety of others are paramount. Always follow basic safety precautions when operating this equipment. Failure to do so may result in serious injury or property damage.
- لفٽ هلائڻ کان اڳ سڀ هدايتون پڙهو ۽ سمجھو.
- پڪ ڪريو ته لفٽ هڪ سطح، مضبوط ڪنڪريٽ بنياد تي نصب ٿيل آهي جيڪو لفٽ جي وزن ۽ وڌ ۾ وڌ لوڊ کي سپورٽ ڪرڻ جي قابل هجي.
- لفٽ صرف تربيت يافته ۽ مجاز اهلڪارن کي هلائڻ گهرجي.
- ڪم واري علائقي کي صاف ۽ روشن رکو.
- Do not exceed the maximum lifting capacity of 9,500 lbs.
- بلند ٿيل گاڏي هيٺان ڪم ڪرڻ کان اڳ هميشه حفاظتي تالا لڳايو.
- Ensure proper vehicle positioning on the runways.
- Keep hands, feet, and clothing clear of moving parts.
- Never leave a raised vehicle unattended without engaging safety locks.
- مناسب ذاتي حفاظتي سامان (پي پي اي) پائڻ.
- ڪنهن به سار سنڀال يا مرمت ڪرڻ کان اڳ بجلي بند ڪريو.
3. پيڪيج مواد
The KATOOL 9500lbs 4 Post Lift package includes the following components:
- 4 Post Lift Structure (Posts, Runways, Crossbeams)
- Moving Kits/Casters (for mobility)
- ايلومينيم آرamps (for vehicle access)
- Jack Tray (for use with optional jacking beam)
- Drip Trays (to protect vehicles parked underneath)
- Hydraulic Power Unit (110V)
- ڪيبل ۽ پللي
- Fasteners and Hardware

Figure 3.1: All included components in the KATOOL 4 Post Lift package.
4. وضاحتون
Key technical specifications for the KATOOL 9500lbs 4 Post Lift Model 4H950:
| خاصيت | تفصيل |
|---|---|
| کڻڻ جي صلاحيت | 9,500 پائونڊ |
| اوچائي کڻڻ | 79 انچ |
| Lifting Time (to full height) | 50 سيڪنڊ |
| مجموعي ڊگھائي | 189 انچ |
| مجموعي ويڪر | 113 انچ |
| ڪالمن جي وچ ۾ ويڪر | 99 انچ |
| بجلي جي گهرج | 110V, 3.0HP |
| ماڊل نمبر | 4H950 |

Figure 4.1: Product specifications and dimensions diagram.
5. سيٽ اپ ۽ تنصيب
Proper installation is critical for the safe and reliable operation of your KATOOL 4 Post Lift. It is recommended that installation be performed by at least two individuals with appropriate tools and equipment.
5.1 سائيٽ جي تياري
- Ensure the installation area has a level concrete floor, free from cracks or defects, capable of supporting the lift's weight and maximum load. Consult a structural engineer if unsure.
- Verify adequate overhead clearance for the lift's maximum height (79 inches) plus the height of the vehicle.
- Ensure access to a dedicated 110V power outlet for the hydraulic power unit.
5.2 Unloading and Component Identification
The lift components are heavy. A forklift or similar heavy lifting equipment is required for unloading the shipment. Carefully unpackage all components and verify against the package contents list. Identify each part before beginning assembly.
5.3 اسيمبلي جا مرحلا (جنرل اوور)view)
- پوسٽون: Carefully position the four posts according to the desired layout, ensuring they are square and level.
- Attach Crossbeams: Secure the crossbeams to the posts. This step often requires lifting the crossbeams into place.
- Install Runways: Attach the runways to the crossbeams. Ensure proper alignment and secure all fasteners.
- رستا ڪيبل: Install the lifting cables, routing them through the pulleys and securing them according to the detailed diagrams provided in the full assembly manual. Ensure cables are properly tensioned.
- Connect Hydraulic System: Mount the hydraulic power unit and connect the hydraulic lines to the lift cylinder. Fill the reservoir with appropriate hydraulic fluid.
- Install Safety Locks: Ensure all safety lock mechanisms are correctly installed and functional.
- لوازمات شامل ڪريو: Install the aluminum ramps, jack tray, drip trays, and casters as needed.

Figure 5.1: The KATOOL 4 Post Lift supporting two vehicles, showcasing its 9500lbs capacity and 79-inch lifting height.

Figure 5.2: Detail of the lift's safety lock mechanism.

Figure 5.3: Detail of the cable routing system.

Figure 5.4: The 110V hydraulic power unit.
6. آپريٽنگ هدايتون
Follow these steps for safe operation of your KATOOL 4 Post Lift:
6.1 پري آپريشن چيڪ لسٽ
- Ensure the lift area is clear of obstructions.
- Verify all fasteners are tight and cables are properly tensioned.
- هائيڊروڪ سيال جي سطح چيڪ ڪريو.
- Confirm power supply is connected.
6.2 گاڏي کڻڻ
- گاڏي جي پوزيشن: Drive the vehicle onto the runways, ensuring it is centered and within the designated lifting points.
- علائقو صاف ڪريو: Ensure no personnel or objects are near the lift's moving parts.
- Initiate Lift: Press and hold the 'UP' button on the hydraulic power unit. The lift will begin to rise.
- حفاظتي تالا لڳايو: Once the desired height is reached, or if working under the vehicle, lower the lift slightly until the safety locks engage. Listen for the audible click.
- Verify Locks: Visually confirm that all four safety locks are fully engaged before working under the vehicle.

Figure 6.1: KATOOL 4 Post Lift in operation, showing a vehicle raised to working height.
6.3 گاڏي کي هيٺ ڪرڻ
- علائقو صاف ڪريو: Ensure no personnel or objects are under or near the lift.
- Raise Slightly: Press the 'UP' button briefly to relieve pressure on the safety locks.
- Disengage Locks: Operate the safety lock release mechanism (typically a lever or button).
- هيٺيون لفٽ: Press and hold the 'DOWN' button or lever to slowly lower the lift.
- Remove Vehicle: Once the lift is fully lowered, carefully drive the vehicle off the runways.
7. سار سنڀال
Regular maintenance is essential for the longevity and safe operation of your KATOOL 4 Post Lift.
- روزاني: Inspect cables, pulleys, and safety locks for wear or damage. Check for hydraulic fluid leaks.
- هفتيوار: Clean the lift structure. Check and lubricate all pivot points and moving parts.
- مهيني: Check cable tension and adjust if necessary. Inspect all fasteners for tightness. Check hydraulic fluid level and top up if needed.
- سالانه: Have a qualified technician perform a thorough inspection of the entire lift system, including hydraulic components, electrical connections, and structural integrity.
8. مسئلا حل ڪرڻ
This section addresses common issues you might encounter with your KATOOL 4 Post Lift.
8.1 Lift Does Not Rise
- طاقت چيڪ ڪريو: Ensure the power unit is plugged in and receiving 110V power. Check circuit breaker.
- هائيڊولڪ سيال: Verify the hydraulic fluid level is adequate.
- موٽر فنڪشن: Listen for the motor running. If not, check electrical connections.
8.2 Lift Lowers Unevenly
- Cable Tension: Inspect and adjust cable tension on all four posts to ensure they are uniform.
- رڪاوٽون: Check for any obstructions preventing smooth lowering.
8.3 Safety Locks Not Engaging/Disengaging
- ميڪانيزم جي چڪاس: Inspect the safety lock mechanism for any debris, damage, or misalignment.
- Cable/Linkage: Ensure the release cables or linkages are free-moving and properly connected.
For issues not covered here, or if troubleshooting steps do not resolve the problem, please contact KATOOL customer support.
9. وارنٽي ۽ سپورٽ
KATOOL stands behind the quality of its products. For specific warranty details, including coverage period and terms, please refer to the warranty card included with your purchase or visit the official KATOOL website. For technical assistance, parts, or any other support inquiries, please contact KATOOL customer service through the contact information provided with your product or on the manufacturer's webسائيٽ.
When contacting support, please have your model number (4H950) and purchase date readily available.